Before drilling
The old AKVA-M site lists a land boundary plan and responsible institution conclusions as initial documents. This wording should be checked against current rules before publication.
Administrative side
Before drilling, site-specific document requirements must be evaluated. After construction, the client needs technical information about the well and water quality.
The old AKVA-M site lists a land boundary plan and responsible institution conclusions as initial documents. This wording should be checked against current rules before publication.
Documentation may include geological and technical data, water analyses, geological section, protection zone calculation, location scheme and subsoil use documents.
AKVA-M helps with new water supply systems, diagnostics of existing wells, repair, cleaning and abandonment.
Drinking water wells for homes, settlements, towns and companies.
Pumping, flushing, diagnostics and repair of existing wells when the structure allows it.
Abandonment of unusable wells with technically correct sealing and filling.
Share the site location, planned water demand and current situation. That helps make the first consultation more useful.